İskenderun · 17 storeys · 2023
Explosive Demolition · One-stop
A Y1 contractor and an engineer responsible for blasting in one team
You do not need to look for separate firms to have your building demolished with explosives. With our Y1-licensed partner and the engineer responsible for blasting on our staff, we run the entire process as one team, from the site survey to the day of the blast.
01Regulations
The team the regulations require
Demolition with explosives requires three separate qualifications. All three are in our team.

- 01
Y1-licensed contractor
Only a contractor holding a Y1-class licence may undertake demolition with explosives; Y2 and Y3 contractors may not.
- 02
Engineer responsible for blasting
Mandatory in every demolition with explosives from 12 August 2027. Is present on site together with the engineer who prepares the demolition plan.
- 03
Certified blaster
The blast is fired by a blaster; from 12 August 2027 a (B) class competency certificate is required.
02Scope of service
What is in the team?(6)
01
Y1 contractor
Our partner undertakes the demolition and is named as the contractor on the permit.
02
Engineer responsible for blasting
Prepares the blast design and assumes responsibility on site.
03
Collapse analysis and blast design
The building’s collapse direction and sequence are analysed in advance with our in-house DTEX CAE software.
04
Permits and explosives supply
The explosives purchase and use permit file, ADR-compliant transport and supply.
05
Vibration monitoring and air overpressure control
Surrounding buildings are protected before and during the blast.
06
Permit file coordination
The demolition plan and application documents are prepared together with the engineer who prepares the plan and the technical supervisor.
03Process
How we work
- 01
Site survey
We inspect the building and its surroundings on site and assess whether it is suitable for demolition with explosives.
- 02
Design and file
Collapse analysis, blast design, the demolition plan and the permit file are prepared.
- 03
Permits and preparation
Explosives permits, supply, notifications and site preparation are completed.
- 04
Blast day
Initiation, vibration monitoring and recording; the debris remains loadable and separable.
04From the field
Before and after demolition(4)
Explosive demolition of structures at different scales, from residential buildings to silo complexes. Click an image to enlarge.




05FAQ
Frequently asked questions
What is a Y1 contractor?
A demolition contractor licence class that may undertake the demolition of any building, with or without explosives. Y2 and Y3 contractors may not carry out demolition with explosives.
When is an engineer responsible for blasting mandatory?
In all demolitions with explosives from 12 August 2027. This engineer is present on site together with the engineer who prepares the demolition plan.
What types of structures do you work on?
Urban renewal buildings, earthquake-damaged buildings, and industrial and high-rise structures such as stacks, silos, towers and tall buildings.
Contact
Planning to demolish your building with explosives?
Tell us its location, height and surroundings; we will assess it together with our partner and get back to you.
- 01Location
- 02Height and number of storeys
- 03Distance to neighbouring buildings
- 04Photographs