
Field record · mechanical clearance
UXO / EOD · Unexploded ordnance clearance
We search the site metre by metre and hand it over safe
Detection, render-safe and safe disposal of unexploded ordnance and mines. The whole chain from non-technical and technical survey to clean site handover; to IMAS standards, with certified EOD teams.
01One discipline, two lines
One chain of responsibility from search to disposal
Detection and disposal are two ends of the same risk management; services can be taken separately or end to end.
Line 01 · Site survey and detection
- 01
Non-technical survey (NTS)
Archives, witnesses and field evidence.
- 02
Technical survey (TS)
Lane design and controlled entry.
- 03
Multi-sensor search
Detector, magnetometer, mine detection dogs (MDD).
- 04
Anomaly record
Positioning, risk classification and land release.
Line 02 · Render-safe and safe disposal
- 01
Identification
Ordnance identification and condition assessment.
- 02
Render-safe (RSP)
Applying render-safe procedures.
- 03
Blow-in-place or transfer
Ordnance unsafe to move is destroyed in place (BIP).
- 04
Clean site handover
Post-disposal check, cleared-area map and report.
Site types
LAND
Former battlefields
Evidence-based area definition and priority.
LAND
Firing and training ranges
Systematic search in dense anomaly areas.
INFRASTRUCTURE
Infrastructure routes
Route clearance before construction.
INDUSTRY
Mining and industrial land
Site safety before operations.
AGRICULTURE
Agricultural land
Returning land to safe use.
WATER
Harbour and dam beds
Underwater detection and disposal.
02Operation process
Every metre on site becomes a recorded decision
- 01
Site assessment · NTS / TS
Review, evidence gathering and prioritisation.
- 02
Detection and mapping
Multi-sensor detection, positioning and anomaly record.
- 03
Risk analysis and plan
IMAS-compliant operation plan, safety distances and evacuation.
- 04
Render-safe · RSP
Making safe with a certified EOD team.
- 05
Safe disposal · BIP
Controlled disposal with environmental safety first.
- 06
Clearance and reporting
Clean site handover, traceable documentation and archive.
03Detection technologies
Which methods do we use?(6)
The choice depends on the ground, the ordnance type and access; most sites use more than one method.







- 01
Manual search
Lane search with a detector; the core method on the most sensitive sites.
- 02
Controlled excavation
Exposing the target with a prodder and hand tools; excavation angle and depth are recorded.
- 03
Mine detection dogs
Scent-based search; fast land release over large areas.
- 04
Mechanised search
High productivity in open areas with a vehicle-mounted large-loop detector.
- 05
Drone magnetometry
A positioned anomaly map from the air; confirmation is always done on the ground.
- 06
Lane discipline and PPE
One operator – one lane, entry and exit control and protective equipment.
04Underwater UXO
Underwater clearance in harbours, dams and at sea
Underwater ordnance needs its own safety set-up for search and disposal; the operation runs on a joint plan of the dive team and the EOD specialist.
- 01
Target detection
Sonar and magnetometer-assisted search.
- 02
Diver confirmation
Confirming and marking the target.
- 03
Underwater RSP or disposal
A render-safe decision or controlled disposal.
- 04
Mitigation
Measures for marine life and coastal structures.
05Safety and quality
What makes the operation safe is the preparation off site


IMAS 10.40
Medical support and MEDEVAC
Every site has an evacuation plan, medical team and communication chain; no search begins before a drill.
ACCREDITATION
Test lane and quality control
Equipment and operator performance are verified on a test lane with known buried targets.
TRACEABILITY
Identification and inventory
Every item found is recorded with type, position and fate; the cleared-area map is part of the handover file.
06Preliminary assessment
See the order of the safety distance
Change the net explosive quantity and the factor to see the order of the safety distance by cube-root scaling.
D = K · Q1/3 · (1 + margin)
0mCube-root scale: 0 kg1/3
An order-of-magnitude preliminary assessment only; it does not replace the operational safety distance. The factor K comes from the applicable standard for the ordnance type, protection and the target to be protected. For cased ordnance the fragment throw distance governs; cordon and evacuation distances are set by site risk analysis within IMAS 10.20.
07International framework
IMAS and the law of the country we work in
The framework combines the International Mine Action Standards with the explosives, safety and environmental law of the country of operation; where they differ, the stricter rule applies.
IMAS 08.10
Non-technical survey
Defining and prioritising the suspected hazardous area.
IMAS 08.20
Technical survey
Evidence-based reduction of the hazardous area boundary.
IMAS 07.11
Land release
Turning survey and clearance evidence into a decision to release land.
IMAS 09.10
Clearance requirements
Search depth, coverage and clean-site handover criteria.
IMAS 09.30
Explosive ordnance disposal
EOD response levels, render-safe and disposal principles.
IMAS 09.40
Mine detection dogs
MDD team accreditation and performance verification.
IMAS 10.20
Worksite safety
Lane layout, safety distances, cordon and evacuation rules.
IMAS 10.30 · 10.40
PPE and medical support
Protective equipment and site medical support and evacuation.
IMAS 10.50
Explosives storage and transport
Storage, transport and site use of demolition charges.
08Training and equipment
The programme we train our own team with is open to organisations
- 01
EOD and clearance team training
Hands-on field training in search, identification and reporting; closed programmes for organisations.
- 02
Accident response and evacuation drill
Rehearsing the medical support chain on site.
- 03
Risk awareness
Explosive hazard awareness for contractor staff and nearby residents.
EOD equipment supply
As ready configurations or by item; explosives supply is handled separately under licence.
KIT
Response kits and tool sets
EOD response kit, prodders and hand tools.
PPE
Protective equipment
EOD apron, visored helmet, ballistic vest.
SITE
Marking and communications
Lane stakes, marking tape, danger signs.
TRAINING
Medical and training materials
Site medical kits, inert training replicas.
09FAQ
Frequently asked questions
Which permits does clearance need?
The permit set depends on the site type, ordnance and disposal method; after the survey we provide a project-specific list and schedule.
What is the difference between non-technical and technical survey?
NTS defines the suspected area from archives, witnesses and field evidence; TS narrows its boundary on evidence through controlled entry and lane search.
Is ordnance destroyed on the spot when found?
No. It is identified and assessed first; ordnance unsafe to move is destroyed in place, the rest is transferred safely to a demolition site.
Who sets the safety distance?
The EOD specialist, from the ordnance type, net explosive quantity, protection and nearby buildings; the calculator here gives the order of magnitude only.
Does drone magnetometry replace the detector?
No, it prepares the way: it maps anomaly density over large areas; confirmation and excavation are always done by the team on the ground.
Which documents are handed over?
Cleared-area map, coverage records, inventory and fate of items found, quality control results and a signed clean-site handover report.
Can I take only the survey?
Yes; survey and risk mapping can be taken independently of clearance and disposal.
Work with us
Let’s make your site safe
Send the site location, size, past use and schedule; we will draw up the survey and clearance plan together.
- 01Non-technical and technical survey
- 02Detection, render-safe and safe disposal
- 03Underwater UXO
- 04Training and EOD equipment supply
—Related services