Bench blast in an open pit

Open pit · bench blast

Drilling & Blasting

From design to firing, one team

Hole pattern, charge and delay design for the rock geology in open pits, tunnels, excavations and underwater sites. Every blast is verified by vibration measurement, and the result feeds into the next design.

12Service lines: from permit to firing and report
3Settings: open pit and excavation, tunnel, underwater
kg/m³Powder factor designed for the fragmentation target
PPVVibration measured and reported at every blast

01Scope of service

From permit to firing, twelve service lines(12)

Every project is designed for its rock mass, surroundings and fragmentation target; services can be taken separately or turnkey.

  • 01

    Open-pit bench blasting

    Pattern, charge and delay design for the production target; controlled bench blasts.

  • 02

    Gallery and tunnel blasting

    Precise advance with face design, cut layout and perimeter hole control.

  • 03

    Excavation and foundation blasting

    Low-vibration, small-diameter controlled blasts near buildings and infrastructure.

  • 04

    Blast design and modelling

    Fragmentation, muckpile and vibration estimates; closed-loop improvement from post-blast analysis.

  • 05

    Vibration monitoring and reporting

    PPV and air overpressure measurement, assessment to standard and a signed report. Seismic Analysis

  • 06

    Drilling plan and control

    Holes true to the pattern, measured deviation and drilling logs for quality control.

  • 07

    Underwater drilling and blasting

    Waterproof charges and delay firing in harbours, cofferdams and underwater excavation.

  • 08

    Explosive bolt design

    Bolt and nut design so that diversion gates can be released within seconds in an emergency.

  • 09

    Engineering tools

    Calculation tools for blast design, powder factor and cost. Tools

  • 10

    Specification and supply consultancy

    Technical specification, contract and inspection-acceptance criteria for explosives procurement. Tender consultancy

  • 11

    Permits and licences

    Explosives purchase and use permits; followed from the application file to the issued permit.

  • 12

    Training and site support

    Team training in storage, charging and firing; on-site supervision of the first blasts.

02Method and design

Milliseconds control the rock

Example delay plan · 4 rows × 7 holes0 ms
FREE FACE7550250255075142117926792117142209184159134159184209276251226201226251276
For illustration: 25 ms between holes, 67 ms between rows. Firing starts at the free face and moves back row by row; as the front row throws the rock forward, the rows behind break into the space it leaves.
  • 01

    Site study and design

    Rock unit, discontinuities and surroundings inventory; pattern, charge and delay plan.

  • 02

    Drilling and control

    Drilling to the pattern; hole length, deviation and water are recorded.

  • 03

    Charging and stemming

    Charging to design, stemming and a connection checklist.

  • 04

    Delay firing

    Sequential firing with electronic or non-electric (shock tube) systems; the charge detonating at the same instant is minimised.

  • 05

    Measurement and reporting

    PPV record, muckpile and fragmentation analysis; the results feed into the next design.

03Mines and quarries

Pattern, charge and delay on the bench(3)

Pattern and charge design for the production target, crusher and screen capacity and the surroundings; measurement and improvement at every blast.

Bench blast in an open pit, aerial view
Fig. 01Bench blast · aerial view
Drill rig, 2023
Fig. 02Drilling · 2023
Bench hole layout, aerial view, 2021
Fig. 03Bench hole layout · 2021
Drilling on the bench, 2021
Fig. 04Drilling on the bench · 2021

Field records

Our own YouTube records; they open on this page.

04Special application

Underwater drilling and blasting

Harbour and jetty deepening, excavation inside cofferdams and removal of submerged rock: holes drilled underwater and loaded with waterproof charges are fired with delays. The water mass acts as stemming; the aim is to break the rock at the planned level while keeping water shock and scatter within limits.

Osmangazi Bridge · 2013
Water-filled excavation on the coast · −21 m
Gördes Dam · 2015
Blasting in the outlet structure shaft · −20 m
Charge
Resistant to water pressure and sleep time
Verification
Underwater pressure measurement, post-blast depth survey

Underwater blast · Osmangazi Bridge · 2013

Development of the water column in the delay sequence.

The blast · first break at the surface
01
Bulge developing in the delay sequence
02
The water column rising
03
Fully developed water column
04
Column and scatter control
05
Osmangazi Bridge, 2013: water-filled excavation on the shore, evening
Fig. 05Osmangazi · water-filled excavation
Osmangazi Bridge, 2013: drilling on the excavation floor
Fig. 06Osmangazi · drilling on the excavation floor
Gördes Dam: the outlet structure in the reservoir
Fig. 07Gördes · outlet structure
Gördes Dam: working cage suspended in the shaft
Fig. 08Gördes · shaft, suspended cage
Gördes Dam: charged holes and firing line
Fig. 09Gördes · charges and firing line

05Tunnels and galleries

Face design and perimeter hole control

Smooth advance true to the profile with the cut layout, perimeter holes and delay plan; overbreak and vibration are kept within limits.

Buca, İzmir, 2022: muck at the tunnel face after the blast
Fig. 10Buca, İzmir · 2022 · face after the blast
Buca, İzmir, 2022: tunnel drill jumbo
Fig. 11Buca, İzmir · 2022 · drill jumbo

06Preliminary assessment

Try the powder factor yourself

Change the hole pattern and charge to see the explosive per cubic metre (powder factor). More calculations: engineering tools.

q = Q / (B · S · H)

0kg/m³

Rock volume per hole: 0 m³

0typical open pit1.5

For preliminary assessment only. The final pattern is designed on site for the rock unit, discontinuities, hole diameter and fragmentation target.

07International framework

Design and monitoring to recognised standards

Blast-induced vibration is assessed and reported to the standard that suits the project location, building type and client specification.

USBM RI 8507

Structure response limit curves

Frequency-dependent PPV limit curves; a common reference for residential structures.

OSMRE 30 CFR 816.67

Blasting control criteria

Maximum allowable PPV by distance and scaled-distance rules.

DIN 4150-3

Effects of vibration on structures

Short-term vibration thresholds by building type and frequency band.

BS 7385-2

Building damage assessment

Cosmetic damage thresholds for transient vibration.

ISO 4866

Measurement and evaluation principles

Sensor placement, recording and data processing principles.

EN 13630 · EN 13763

Explosive product standards

Conformity principles for detonating cord, safety fuse and detonators.

08FAQ

Frequently asked questions

Which permits are needed for blasting?

An explosives purchase and use permit, shotfirer competence certificates and a site-specific safety plan. After the survey we provide the permit list and schedule.

Can blasting be done near buildings?

Yes. A building inventory is made, site constants are determined with a trial blast, and charge and delay design follows the limit of the chosen standard; every blast is recorded by a vibration monitor.

Why does delay firing matter?

When holes fire milliseconds apart, the charge detonating at the same instant is smaller; vibration drops, the rock is thrown forward under control and fragmentation improves.

How is flyrock prevented?

With the right bottom charge, adequate stemming, pattern discipline and control of the firing direction; blasting mats are used where needed and safety distances are set in the site plan.

Can the fragment size be guaranteed?

Fragmentation is a result of rock structure, pattern and powder factor. The target size is set by crusher and screen capacity, measured by post-blast image analysis and improved at every blast.

Do you obtain the explosives permits?

Yes. We handle explosives purchase and use permits from preparing the application file to the issued permit.

How are charges protected underwater?

Because the hole is full of water, waterproof charges and detonators resistant to pressure and sleep time are used; circuit continuity is tested underwater.

Can I take only the drilling plan or only measurement?

Yes. Blast design, drilling control and vibration monitoring are also provided separately.

Work with us

Let’s assess your site together

Send the rock unit, bench height, production target and distance to nearby structures; we will work out the pattern and charge proposal together.

  • 01Pattern, charge and delay design
  • 02Drilling control and blast management
  • 03Vibration and air overpressure measurement
  • 04Permit, specification and supply support