Kartal · 2013 · after the blast
Reference projects
Field-proven engineering
In the city, in the earthquake zone, in industrial plants and beyond borders: a selection of our explosive demolition and explosives engineering projects. Each card opens the project’s key data and our own record.
01Explosive demolition
Every structure different; the same discipline(11)
Cards open the matching row in the project list on the Explosive Demolition page; the videos are there, our own YouTube records. Full list: project list.

District hospital
17 storeys · neighbour 7 m · progressive collapse · DTEX CAE back-analysis
Open the file, watch the video→
Earthquake-damaged buildings
17 storeys + 4 basements · synchronised demolition
Open the file, watch the video→
In the earthquake zone, one after another
Adjoining buildings, two buildings, high-rises · vibration at 31.9% of the DIN 4150-3 limit
Open the file, watch the video→
Hospital building
Dense residential area · neighbour 15 m
Open the file, watch the video→
Four residential blocks
17 storeys · neighbour 12 m · single blast · debris spread 10 m
Open the file, watch the video→
Military housing · 10 buildings
The first urban regeneration project carried out with explosives in Türkiye
Open the file, watch the video→
Reinforced-concrete building
Demolition with column drilling, wrapping and protection
Open the file, watch the video→
Grain silo complex
64 reinforced-concrete silos · silos 42 m · towers 55 m
Open the file, watch the video→
Grain silo complex
Elevator towers · progressive implosion
Open the file, watch the video→
Balanced-cantilever bridge pier
C50 concrete · 660 holes · 0.38 mm/s at 250 m
Open the file, watch the video→
Motorway bridges
O4 motorway · 2 bridges
Open the file, watch the video→02Explosives engineering
Seismic, underwater and mining(4)
Our explosives engineering projects beyond structural demolition. For a structural analysis example: DTEX CAE.

Seismic data acquisition with explosives
6 shooting days · 2,320 kg seismic dynamite · 1,450 electric detonators
Open the file→
Underwater blasting
−20 m underwater
Open the file→
Underwater blasting
−21 m underwater
Open the file→
Bench blasting
Hole pattern and charge design for the geology
Open the file→03Organisations we have worked with
Public, industrial and international(23)
Public bodies, industrial companies and employers abroad. The logos show the owner of the work; the work was carried out by DTEX.























Work with us
Let the next project be yours
If you are looking for a science-based, safe and proven partner for your project, let’s talk.
- 01Number of storeys and structural system
- 02Distance to neighbouring buildings
- 03Photographs and, if available, project drawings
- 04Schedule and location